Solid Waste Management

The Contractor shall oversee waste disposal and ensure that appropriate documentation is obtained from the contracted vendor.  The Contractor is responsible for tracking recycling during the facility alteration or addition.

  • Before the project starts, a construction waste recycling plan designed to achieve the maximum practical level of recycling will be developed.
  • Examples of materials that will be addressed by the plan include, but are not limited to, building components and structures, panels, attached finishing’s, carpet and floor material, adhesives, sealants, paints and coatings.
  • During each construction project, the recycling plan will be implemented.
  • The total amount of construction waste and the total amount of recycled construction waste will be documented.